Skip to content
Sciences Urbaines & Développement
Betsud — Sciences Urbaines et de Développement

Marrakech-Safi Regional Territorial Development Plan (SRAT)

Regional Territorial Development Plan for a region that brings together a tourist metropolis, an industrial Atlantic coastline, an agricultural plain and the High Atlas, prepared between 2020 and 2023.

Marrakech-Safi holds together a world-class tourist destination, an industrial and port coastline on the Atlantic, the Haouz plain and the northern slope of the High Atlas. SUD prepared the region’s Regional Territorial Development Plan for the Regional Council, between 2020 and 2023.

Assignment record

Commissioning authority Marrakech-Safi Regional Council
Assignment Preparation of the Regional Territorial Development Plan
Scope Marrakech-Safi region
Period 2020-2023
Consortium SUD, sole contractor
Horizon Twenty-five years
Legal framework Organic Law no. 111-14 on regions
25year horizonregional reference framework
11disciplinesbrought to the assignment
4years of studyfrom 2020 to 2023
1regional GISsupporting implementation monitoring

The challenge: four geographies, one region

Few Moroccan regions bring together spaces as dissimilar. A tourist metropolis whose economy depends on a global flow it does not control. An industrial and port coastline on the Atlantic, around Safi and Essaouira, whose logics are those of processing and export. An irrigated agricultural plain. And an isolated mountain slope, sparsely populated, where access to services is the first issue.

A regional plan has to avoid two symmetrical pitfalls: writing a document that speaks only of the metropolis, or producing four plans side by side with no overall coherence. The answer lies in project areas — reasoning by homogeneous territories identified by their potential, rather than by administrative boundaries.

The method: six strands

A strategic territorial diagnosis supported by field surveys at regional scale, then strategic environmental studies on the sustainability and resilience of the territory — a particularly sensitive question in a region that combines water stress, tourist pressure and mountain areas.

Then the determination of project areas and priority development zones, intended to be translated into urban development master plans and municipal development plans. Then the definition of the broad directions of regional development over twenty-five years.

Finally two operational deliverables: a bank of structuring projects with their funding structure, ranked by feasibility and territorial impact, and a regional geographic information system serving as a support both for preparation and for monitoring implementation.

The team

Eleven specialisms, covering at once the environmental, economic, demographic and institutional dimensions.

  • Project manager
  • Environmental specialist
  • Regional economics specialist
  • Infrastructure and mobility specialist
  • Metropolisation specialist
  • Rural development specialist
  • Statistician
  • Demographer
  • Institutional governance specialist
  • Digitalisation specialist
  • GIS and geomatics specialist

What the assignment shows

Marrakech-Safi is one of the six regional territorial development plans carried out by SUD since the 2015 territorial reform, alongside Fès-Meknès, Tanger-Tétouan-Al Hoceïma, Béni Mellal-Khénifra, Casablanca-Settat and Souss-Massa.

Six regions out of twelve, at very different stages of development and across very different geographies. It is at this scale that a consulting firm’s capability is tested: not in applying one and the same model, but in recognising what is particular to each territory before programming anything at all.

Our references

All the assignments carried out by the firm, from the national plan to municipal development plans.

See all our references

Other assignments cited

  1. Casablanca-Settat Region, SRAT — see our case study.
  2. Souss-Massa Region, SRAT — see our case study.
  3. Fès-Meknès Region, SRAT 2017-2042 — see our case study.
  4. Ministry of Territorial Planning, National Territorial Development Plan — see our case study.
All projects

A territorial question to analyse, or a project to structure?

Let’s talk about your territory, your objectives and the expertise your project calls for.